Project Name Location Team Date Value
Prince Henrys Grammar School Otley Restoration & Install team (Yorkshire & West Division) 2016 £65K

Prince Henrys Grammer School - IWP DanskIWP Dansk manufactured and installed over 100 replacement timber windows in under 8 weeks, from design to redecoration, and had the school back and ready for the staff after the October break.

From the school shutting on Friday, the team worked over the weekends to make this job possible, and fitted all 100 windows in 14 days. Who needs six weeks holidays!

The windows, being set in the school’s Edwardian façade required us to set a high specification in both design and quality.

We met this specification, procuring and installing a high quality product which a year on shows no signs of deterioration. The timescales on the project were very tight with only a two month construction period. We achieved this timeframe, completing the scheme on time and budget in a swift and professional manner.